This page contains a list of document required to be submitted related to SOLAS Requirement

Fire Control Plan / Booklet For Cargo Ships
Safety Plan Review Report
Existing (VOLUME I), includes:
- General Arrangement
- Machinery Arrangement

- Additional plans required for unattended machinery space notation:
o   Instrument and Alarm List
o   List of Automatic Safety Functions (e.g. slowdowns, shutdowns, etc.)
o   Fire Alarm System
o   Function Testing Plan

Piping Systems, Valves, Fittings and Pumps
Fire Protection and Fire Extinguishing Equipment
◉ Lighting, includes:
- Lighting arrangement
- Emergency lighting arrangement
◉ Ship's safety devices, includes:
- General alarm systems
- Fire detection and alarm systems
- CO2 alarm system
- Gas detector systems
- Inert gas system
- Fixed water-based local application fire-fighting systems (FWBLAFFS)
Plans for helicopter facilities
Plans for the arrangement for carriage of dangerous goods
Survival craft arrangement, including MES
Survival craft design, construction, fittings, release & recovery mechanism, embarkation and launching arrangement
Plans relating to bridge design and arrangements of navigational system and equipment, including specification
Plans for pilot transfer arrangement
Plans for embarkation and disembarkation from ships
Plans for cargo tank protection
Plans for gas measurement for double-hull and double-bottom spaces
Plans for fixed hydrocarbon gas detection system
Plans for the protection of cargo pump room
Ship Construction File / Review Report (Ship Construction File)
Stability Booklet Review Report
Damage Control Plan & Booklet Review Report
Fire Control Plan / Booklet For Cargo Ships
Fire Control Plan / Booklet For Passenger Ships
Cargo Securing Manual
Grain Loading Manual
Ship Structure Access Manual Review Report
Deterministic Damage Stability Booklet Review Report
Probabilistic Damage Stability Booklet Review Report
Existing (VOLUME I), includes:
- Particulars of the type and main dimensions of the ship, building year, building yard, freeboard, stability documentation and details of the anchor equipment
- Particulars of the type, output and main data, building year and manufacturer of the main engine(s) and of the auxiliary machinery essential for operational safety, the electrical installations, the inert gas system, the automatic/remote-control system, the safety arrangements, the steering gear and the windlasses
- General Arrangement
- Capacity Plan
- Hydrostatic Curves
- Loading Manual, where required.
- Midship Section
- Scantling Plan
- Decks
- Shell Expansion
- Transverse Bulkheads
- Rudder and Rudder Stock
- Machinery Arrangement
- Intermediate, Thrust and Screw Shafts
- Propeller
- Main Engines, Propulsion Gears and Clutch Systems (or Manufacturer make,model and rating information)
- For Steam Turbine Vessels, Main Boilers, Superheaters and Economisers (or Manufacturer make, model and rating information) and Steam Piping
- Bilge and Ballast Piping Diagram
- Wiring Diagram
- Steering Gear Systems Piping and Arrangements and Steering Gear Manufacturer make and model information
- Torsional vibration calculations for vessels less than two (2) years old, torsional vibration calculations are to be submitted.
- Additional requirements for vessels with ice class notation: plans for flexible couplings and/or torque limiting shafting devices in the propulsion line shafting (or manufacturer make, model and rating information) are to be submitted.
- Additional plans required for oil tankers: pumping arrangement at the forward and after ends and drainage of cofferdams and pump rooms are to be submitted.

- Additional plans required for unattended machinery space notation:
o   Instrument and Alarm List
o   List of Automatic Safety Functions (e.g. slowdowns, shutdowns, etc.)
o   Fire Alarm System
o   Function Testing Plan

VOLUME II, includes:
- Longitudinal Section
- Ice Strengthening
- Bulkheads
- Bottom Structures
- Engine and boiler seatings
- Stem and stern post, and rudder
- Hatchways (Hatchways Construction and hatch Covers)
- Longitudinal Strength
- Material
- Weld Joints
- Lashing and Stowage Devices
- Substructures
- Closing Conditions (ICLL possible)
- Watertight integrity
- Intact stability
- Damage Stability
- Structural Fire Protection
VOLUME III, includes:
- Internal Combustion Engines and Air Compressors
- Turbomachinery / Steam Turbines
- Turbomachinery / Gas Turbines and Exhaust Gas Turbochargers
Main Shafting
Gears, Coupling
Propeller
Steam Boilers
Thermal Oil Systems
Pressure Vessels
Oil Burners and Oil Firing Equipment
Storage of Liquid Fuels, Lubricating, Hydraulic and Thermal Oils as well as Oily Residues
Piping Systems, Valves, Fittings and Pumps
Fire Protection and Fire Extinguishing Equipment
Machinery For Ships With Ice Classes
Steering Gears, Rudder Propeller Units, Lateral Thrust Units, Windlasses, Winches, Hydraulic Control Systems, Fire Door Control Systems and Stabilizers
Special Requirements for Tankers
Torsional Vibrations
VOLUME IV, includes:
◉ Power-supply equipment, includes:
- Electrical plant, power generating and distribution (general layout drawing)
- Generators, UPS units, batteries with maintenance schedule, transformers
- Spaces with an explosion hazard with details of installed equipment
- Short-circuit calculation, where total generators output > 500 kVA
- Electrical power balance (main and emergency supply)
- Protection coordination study with all values > 3000 kVA
- Main switchgear
- Emergency switchgear
- Main distribution boards
- Refrigerating installation: switchgear, monitoring, control and design
- Main cableways
- Main cableways for medium-voltage systems
- Bulkhead/deck penetrations A 6 0
- Cable layout/-list
◉ Manoeuvring equipment, includes:
- Steering gear drive and control systems
- Rudder propeller and lateral thrust system
- Controllable pitch propeller system
◉ Lighting, includes:
- Lighting arrangement
- Emergency lighting arrangement
- Additional emergency lighting arrangement and facilities
- Electric operated LLL-system
◉ Starting, control and monitoring equipment, includes:
- Monitoring systems for machinery
- Safety devices/safety systems for machinery
- Electrical starting arrangements for auxiliary and main engines
- Controls and adjustments for essential equipment/drive installations
- Ballast water treatment system
◉ Ship's safety devices, includes:
- General alarm systems
- Technical officer's alarm system
- Navigation and signalling lights, power supply and monitoring system
- Fire detection and alarm systems
- CO2 alarm system
- Watertight doors operating and position monitoring system
- Fire doors operating and position monitoring system
- Control and monitoring systems for shell doors, gates and Ro/Ro decks
- Emergency shut-off facilities
- Tank level indicators, alarms, shutoff facilities
- Gas detector systems
- Inert gas system
- Fixed water-based local application fire-fighting systems (FWBLAFFS)
- Water ingress detection system
◉ Communication systems, includes:
- Public address system
- Important intercommuncation systems
◉ Electrical propulsion plants, includes:
- Propulsion motors
- Static converters
- Control, adjustment, monitoring
- Functional description for Class Notation RP ..%
- FMEA for Class Notation RP ..%
- Trial program
Cargo tank ventilation system plans
Helicopter facilities
Plans acces to bow
Emergency towing plans
Access to cargo area
Means of access plans
Arrangement for opening below freeboard deck
Loading instrument
Plans for the provision and position of the radio installation including sources of energy and antennas
Plans for the provision and position of the radio life-saving appliances
Stability Booklet Review Report
Fire Control Plan / Booklet For Passenger Ships
Existing (VOLUME I), includes:
- Shell Expansion
- Machinery Arrangement
- Bilge and Ballast Piping Diagram
- Wiring Diagram

- Additional plans required for unattended machinery space notation:
o   Instrument and Alarm List
o   List of Automatic Safety Functions (e.g. slowdowns, shutdowns, etc.)
o   Fire Alarm System
o   Function Testing Plan

VOLUME II, includes:
- Bulkheads
- Bottom Structures
Piping Systems, Valves, Fittings and Pumps
Fire Protection and Fire Extinguishing Equipment
VOLUME IV, includes:
◉ Power-supply equipment, includes:
- Electrical power balance (main and emergency supply)
- Lighting arrangement
- Emergency lighting arrangement
- General alarm systems
- Fire detection and alarm systems
- Watertight doors operating and position monitoring system
- Public address system
Plans for the arrangement for carriage of dangerous goods
Survival craft arrangement, including MES
Survival craft design, construction, fittings, release & recovery mechanism, embarkation and launching arrangement
Plans relating to bridge design and arrangements of navigational system and equipment, including specification
Plans for pilot transfer arrangement
Plans for embarkation and disembarkation from ships
Plans for the provision and position of the radio installation including sources of energy and antennas
Plans for the provision and position of the radio life-saving appliances
Stability Booklet Review Report
Damage Control Plan & Booklet Review Report
Procedures And Arrangement Manual (P & A Manual) Review Report
Ship Marine Pollution Emergency Plans (SMPEP)
Existing (VOLUME I), includes:
- General Arrangement
- Capacity Plan
VOLUME II, includes:
- Material
- Weld Joints
- Watertight integrity
- Intact stability
- Damage Stability
- Structural Fire Protection
Piping Systems, Valves, Fittings and Pumps
Pumping and stripping system plans
Tank washing system and equipment plan
Underwater discharge outlet plans
Ship Construction File / Review Report (Ship Construction File)
Stability Booklet Review Report
Damage Control Plan & Booklet Review Report
Fire Control Plan / Booklet For Cargo Ships
Ship-Specific Plans and Procedures for Recovery of Persons From the Water (Recovery Plans and Procedures)
Safety Plan Review Report
Existing (VOLUME I), includes:
- General Arrangement
- Capacity Plan
- Bilge and Ballast Piping Diagram
- Wiring Diagram

- Additional plans required for unattended machinery space notation:
o   Instrument and Alarm List
o   List of Automatic Safety Functions (e.g. slowdowns, shutdowns, etc.)
o   Fire Alarm System
o   Function Testing Plan

VOLUME II, includes:
- Longitudinal Strength
- Material
- Weld Joints
- Watertight integrity
- Intact stability
- Damage Stability
- Structural Fire Protection
Steam Boilers
Thermal Oil Systems
Pressure Vessels
Piping Systems, Valves, Fittings and Pumps
Fire Protection and Fire Extinguishing Equipment
VOLUME IV, includes:
◉ Power-supply equipment, includes:
- Electrical plant, power generating and distribution (general layout drawing)
- Generators, UPS units, batteries with maintenance schedule, transformers
- Spaces with an explosion hazard with details of installed equipment
- Short-circuit calculation, where total generators output > 500 kVA
- Electrical power balance (main and emergency supply)
- Protection coordination study with all values > 3000 kVA
- Main switchgear
- Emergency switchgear
- Main distribution boards
- Refrigerating installation: switchgear, monitoring, control and design
- Main cableways
- Main cableways for medium-voltage systems
- Bulkhead/deck penetrations A 6 0
- Cable layout/-list
◉ Lighting, includes:
- Lighting arrangement
- Emergency lighting arrangement
- Additional emergency lighting arrangement and facilities
- Electric operated LLL-system
◉ Starting, control and monitoring equipment, includes:
- Monitoring systems for machinery
- Safety devices/safety systems for machinery
- Electrical starting arrangements for auxiliary and main engines
- Controls and adjustments for essential equipment/drive installations
- Ballast water treatment system
◉ Ship's safety devices, includes:
- General alarm systems
- Navigation and signalling lights, power supply and monitoring system
- Fire detection and alarm systems
- CO2 alarm system
- Watertight doors operating and position monitoring system
- Fire doors operating and position monitoring system
- Control and monitoring systems for shell doors, gates and Ro/Ro decks
- Emergency shut-off facilities
- Tank level indicators, alarms, shutoff facilities
- Gas detector systems
- Inert gas system
- Fixed water-based local application fire-fighting systems (FWBLAFFS)
- Water ingress detection system
◉ Communication systems, includes:
- Public address system
- Important intercommuncation systems
◉ Electrical propulsion plants, includes:
- Propulsion motors
- Static converters
- Control, adjustment, monitoring
- Functional description for Class Notation RP ..%
- FMEA for Class Notation RP ..%
- Trial program
Cargo pressure/temperature control plans
Cargo tank ventilation system plans
Environmental control plans
Mechanical ventilation plans
Instrumentation plans
Use of cargo as fuel plans
Cargo pump room&cargo compressor rooms arrangement
Cargo control room arrangements
Air locks arrangements
Bow or stern loading and unloading arrangements
Cargo and process piping arrangements
Cargo system valving arrangements
Plans acces to bow
Fire Control Plan / Booklet For Cargo Ships
Fire Control Plan / Booklet For Passenger Ships
Existing (VOLUME I), includes:
- General Arrangement
- Capacity Plan
- Hydrostatic Curves
- Loading Manual, where required.
- Midship Section
- Scantling Plan
- Shell Expansion
- Bilge and Ballast Piping Diagram
- Wiring Diagram
VOLUME II, includes:
- Bulkheads
Piping Systems, Valves, Fittings and Pumps
Fire Protection and Fire Extinguishing Equipment
VOLUME IV, includes:
◉ Ship's safety devices, includes:
- Navigation and signalling lights, power supply and monitoring system
- Watertight doors operating and position monitoring system
Ship-Specific Plans and Procedures for Recovery of Persons From the Water (Recovery Plans and Procedures)
ISM Code - Safety Management System Manual
Ship-Specific Plans and Procedures for Recovery of Persons From the Water (Recovery Plans and Procedures)
ISM Code - Safety Management System Manual
SSP Document Review Report