/ Load Line

Load Line

Ensuring Safety and Stability

The load line (Plimsoll Mark) is a vital safety standard that marks the maximum depth at which a ship can be safely loaded—maintaining stability, buoyancy, and structural integrity during a voyage. As a Flag State-approved agency, BKI has full authority to conduct surveys, calculations, and certification to ensure your ship's load line markings are accurate and valid.

The Critical Importance of the Load Line

Preventing overloading is key to maritime safety. Proper markings ensure the vessel maintains stability, buoyancy, and an adequate safety margin throughout its voyage.

Periodic Load Line Survey (Annual)

Every vessel must undergo an annual Load Line Survey. BKI's expert surveyors will perform thorough inspections to confirm compliance with international requirements. Timely completion of this survey is critical—delaying it can lead to detention of the vessel and operational interruptions.

Our Load Line Certification Services

BKI offers two types of load line certification, depending on your vessel's area of operation and regulatory framework. Both certificates are valid for a period of 5 (five) years, conditional upon successful periodic surveys.

1. National Load Line Certificate (PM 29 Tahun 2016)

  • Applicability: This certificate applies to ships engaged in Indonesian domestic waters. It also applies to non-convention ships that are engaged in international waters.
  • Regulation: Issued in accordance with the Indonesian Minister of Transportation Regulation No. 29 of 2016.

2. International Load Line Certificate (ILLC 1966)

  • Applicability: This certificate applies to all convention ships engaged in international voyages. It can also be chosen by ships operating in Indonesian waters that opt for certification under the international convention.
  • Regulation: Issued in accordance with the International Convention on Load Lines (ILLC), 1966.

Your Path to Certification: A Step-by-Step Guide

BKI has a clear and efficient procedure to guide you through the certification process from start to finish.

  1. 1

    Step 1: Application & Documentation Submission

    Submit your application to the nearest BKI branch office. At this stage, you will also need to submit key technical documents, including the General Arrangement drawingand Stability Calculation, for our review.

  2. 2

    Step 2: Onboard Verification Survey

    A BKI Surveyor will visit your vessel to verify that all requirements related to the load line are met onboard.

  3. 3

    Step 3: Freeboard Mark Installation Instruction

    Following a successful survey and review, the BKI Head Office or a Regional Office will issue a formal "Instruction of Freeboard Mark Installation."

  4. 4

    Step 4: Supervised Mark Installation

    The installation of the official freeboard marks on the vessel's hull must be supervised by a BKI Surveyor to ensure it is done accurately and according to regulations.

  5. 5

    Step 5: Issuance of Load Line Certificate

    Once the marks are correctly installed and verified, BKI will issue the final Load Line Certificate for your vessel.

Logo BKI Putih

Our experts are here to help.

Fill out the form to contact us or create your myBKI account and start using our TICCS services

Phone Icon

+62 21 430 10 17

Email Icon

cs@bki.co.id

Location Icon

Jl. Yos Sudarso No.38-40, Sungai Bambu,
Kec. Tj. Priok, Jkt Utara,
DKI Jakarta 14320